
Bathroom Projects
Repair and Overhaul


Phase 1 – General demo

Phase 1 – Rot repair

Phase 1 – Installation of new gray tile

Phase 2 – Original shower door

Phase 2 – Fiberglass surround

Phase 2 – Mildew behind fiberglass

Phase 2 – Shower head raised by 6″ and niche was added

Phase 2 – Cement board installed

Phase 2 – RedGard waterproofing applied

Phase 2 – 12×24″ ceramic tiles installed

Change Order by Client – Removed previously installed gray tiles (they made space too dark)

Change Order by Client – Brighter tile pattern chosen and Ditra heat installed under tile

Change Order by Client – New floor tile completed

Change Order by Client – Extended the backsplash around sink into a tiled half-wall feature















Tile Installation and Finish work


Structural build-out already complete

Window waterproofing complete

Window needs to be waterproofed

Matching backsplash added around sink

Linear drain complete

Added niche

RedGard waterproofing

Installation progress

Installation progress

Niche installed

Window detail

Shower floor tile

Installation progress

Installation progress

Installation progress

Linear drain pieces laid out

Installation progress

Installation progress

Installation progress

Door trimmed

Door cut to new height of flooring and reinstalled; trim added around door jamb






















Small addition to basement

Client added shower fixtures later

Converted small 3′ x 3’6″ closet space into a shower

Installed Schluter niche and drain

Using Schluter Shower System (lifetime manufacturer warranty)

Floor tile and curb installed

Installation progress

Installation progress







Tub Surround


Old and tired

Removed sheetrock to access plumbing

Installed cement backer board

RedGard waterproofing

Installation progress

Installation complete







En Suite

Shower glass freshly installed

Tub installed

Linear drain installed

Standup shower is old, tired, and too small

Jetted tub already removed due to a prior leak

Demo complete

Enlarged walk-in space; ready for pre-slope shower pan

Old-school shower pan is set; base of linear drain is installed

Cement backer board installed; second shower controller added

Installation progress

Linear drain pieces cut and laid out

Tile cut for in-wall plumbing under window

Installation progress

Shower curb complete

Tub space complete















